Top plates can be installed either before or after raising wall sections. Follow nailing schedule per installation instructions. Note the continuous bead of foam sealant into which the plates are set.
Structural Insulated Panels (SIP) can create a strong, well-insulated, airtight, building envelope. They can, however, be unforgiving when it comes to moisture management. Most SIP dry slowly if or when they get wet, so back-vented claddings, robust flashing details, meticulous sealing of penetrations, and effective spot/whole house ventilation are all essential.
Detail Caption:
Top plates can be installed either before or after raising wall sections. Follow nailing schedule per installation instructions. Note the continuous bead of foam sealant into which the plates are set.
For more information on SIPs, see the Green Building Encyclopedia
For more information on SIP manufacturers
NOTE:The GBA SIP details consist of 90 pdfs. Currently, the details are not available as dwg files. These 90 details are copyrighted by Green Mountain Panel and included in the GBA Construction Detail Library with express permission from Green Mountain Panel. All of the SIP Details were drawn by Steve Baczek and reviewed by Peter Yost for Green Mountain Panel, the same team that developed all of the other GBA details.
To see the SIP details with the step-by-step installation procedures, download theGreen Mountain Panel Installation Manual.
This article is only available to GBA Prime Members
Sign up for a free trial and get instant access to this article as well as GBA’s complete library of premium articles and construction details.
Start Free TrialAlready a member?Log in