Question about the level of “perfection” that is required for insulating wood headers: Climate Zone 4A, 2x6 exterior walls, and I detailed the headers with the required number of vertical…
I’m installing Accu-Vent baffles in a new construction home and have a few questions concerning installation details. Background: Climate Zone 4A, 8” raised heel trusses, 4.5:12 pitch roof with flat…
Good evening, This question is for a new construction home, climate zone 4A, with north being to the right in the attached PDF. I was planning on using OC spray…
Recent Q&A
Insulated Wood Headers
Question about the level of “perfection” that is required for insulating wood headers: Climate Zone 4A, 2x6 exterior walls, and I detailed the headers with the required number of vertical…
Accu Vent Baffle Installation Detail Questions
I’m installing Accu-Vent baffles in a new construction home and have a few questions concerning installation details. Background: Climate Zone 4A, 8” raised heel trusses, 4.5:12 pitch roof with flat…
Insulating at Steel Beam
Good evening, This question is for a new construction home, climate zone 4A, with north being to the right in the attached PDF. I was planning on using OC spray…