GBA Logo horizontal Facebook LinkedIn Email Pinterest Twitter Instagram YouTube Icon Navigation Search Icon Main Search Icon Video Play Icon Plus Icon Minus Icon Picture icon Hamburger Icon Close Icon Sorted

Community and Q&A

Labour coefficient for fixing glass blocks?

Ugyen Gyeltshen| Posted inBuilding Code Questionson

The glass panel I chose is 20cmx20cm and 75mm thick. I want to fix this with aluminum extrusions. As I am outsourcing to the contractor, I want to know the labour coefficients of fixing these blocks.
How much can a worker (carpenter or mason) fix the area in a day (8 hours)? Thank you.

GBA Prime

Join the leading community of building science experts

Become a GBA Prime member and get instant access to the latest developments in green building, research, and reports from the field.

Replies

  1. GBA Editor
    Martin Holladay||#1

    Ugyen,
    According to the Dodge Unit Cost Guide, it the labor required to install glass block is 0.242 person-hours per square foot.

    However, this labor assumption varies widely by geography. If you live in a country that spells "labour" with a U, the number of person-hours could easily vary.

Log in or create an account to post an answer.

Community

Recent Questions and Replies

  • |
  • |
  • |
  • |