Hi, What is the best approach to have a continuous vapour barrier around the floor joist/rim board from the first to the second floor? Thank you, Arnold
Hi,Why is GBA now reviewing questions before they are posted? What brought the need for this new requirement? The question I asked a day ago is still not showing up.Thank…
Hi,I am doing an exhaust ERV system and the HVAC design has 20CFM for the both bathroom. Is that sufficient to handle the moisture after hot showers?Note that I am…
Hi,Is there a specific spray foam that should be used to fill in gap mostly around pipes and conduit when installing insulation below the slab prior to pouring?The EPS foam…
Hi, Is there any issues or concern with connecting the weeping tile from my detached garage to the house? The reason is the weeping to daylight for the house is…
Hi,The well will be drilled and the water line with electrical wire pushed through after the slab has been poured.I presume installing it before the footings are installed would be…
Hi, Having read a bunch articles on Radon, there does not seem to be a clear indication as to the location and length of perforated pipe (corrugated Big "O" or…
Hi, I am looking for some opinion from everyone on GBA on which ventilation setup I should lean towards. I know there are different views and approach but I am open…
Hi, I will be framing our new house come spring 2022 after the original company not longer seems interested and other framing company are either fully booked or charging a…
Hi,Due to endless delays to obtain my building permit, we were schedule to pour the 18-20 inches footing with the slab on grade in October but now it won't happen…
Recent Q&A
Vapor Barrier at Floor Joist and Rim Board
Hi, What is the best approach to have a continuous vapour barrier around the floor joist/rim board from the first to the second floor? Thank you, Arnold
Question being reviewed
Hi,Why is GBA now reviewing questions before they are posted? What brought the need for this new requirement? The question I asked a day ago is still not showing up.Thank…
Exhaust only ERV system
Hi,I am doing an exhaust ERV system and the HVAC design has 20CFM for the both bathroom. Is that sufficient to handle the moisture after hot showers?Note that I am…
Slab insulation
Hi,Is there a specific spray foam that should be used to fill in gap mostly around pipes and conduit when installing insulation below the slab prior to pouring?The EPS foam…
Tying Garage into House Drainage System
Hi, Is there any issues or concern with connecting the weeping tile from my detached garage to the house? The reason is the weeping to daylight for the house is…
Water line for slab on grade
Hi,The well will be drilled and the water line with electrical wire pushed through after the slab has been poured.I presume installing it before the footings are installed would be…
Pipe for Radon Mitigation System
Hi, Having read a bunch articles on Radon, there does not seem to be a clear indication as to the location and length of perforated pipe (corrugated Big "O" or…
Ventilation system question
Hi, I am looking for some opinion from everyone on GBA on which ventilation setup I should lean towards. I know there are different views and approach but I am open…
Sheathing to Interior vs. Exterior
Hi, I will be framing our new house come spring 2022 after the original company not longer seems interested and other framing company are either fully booked or charging a…
slab on grade in winter
Hi,Due to endless delays to obtain my building permit, we were schedule to pour the 18-20 inches footing with the slab on grade in October but now it won't happen…