绝缘安装计划任何好处吗?
我应该说的是我的问题或计划,是关于我计划的保温包。有些细节......
房子建于1947年。主要是原创,粗糙的锯,材料是真正的测量,在某些地方归因于某些“角色”。房子有一些沉降的区域,但有很好的骨头。木头似乎是基于别人告诉我的东西,如果它很重要,那就是钉子。壁板是铝,似乎是聚苯乙烯泡沫塑料的背衬。外部壁板护套包括屋顶护套只是平板电路板似乎你可以在每个人之间轻松看。在我买了房子后,开始看到许多奇怪的情况旧创造的建设者。哈哈。
无论如何,我不完全是一位职业木匠,但我确实知道一些基础,并快速学习。我可以观看或阅读指南或手动,让节奏变得相当容易做些什么。在尝试通常在尝试某些内容之前,我试图研究一切,这就是这扮演的地方......
经过完全塑造楼上的卧室后,决心刚刚用硬木地板取代,然后结束了机电和干墙问题,遇到了广泛的绝缘,电气,空气密封,水问题...一件事导致另一件事,显然我打开了蠕虫的罐头。他们说你真的没有看到潜在的问题,直到你至少在一年内生活在一年之上,但我很高兴我撕开了裸露的框架。楼上设有2间带拱形天花板和膝盖的卧室,我认为最初是一个非常大的阁楼,一间当前我的女儿有一间卧室,所以我现在跳过另一张卧室。一次尝试1侧。除了我解决的所有其他问题(并且还有很多问题)我正在寻找我想要做的绝缘包的任何建议,但是如果他们是稍后的问题,请不确定。我觉得我最好进入110%,因为绝缘明智,我相信这是整个房子里最重要的方面。我认为是传统的额外金钱值得。我要去这条路线,因为我不相信喷雾泡沫,它可以陷阱水分(更适合较新的家园),它更昂贵,大约是双倍的,而且以这种方式还没有永久困住。
屋顶线/拱形墙
从外面的外面,我将把1英寸的木头带到里面的屋顶,椽子的一侧,而不是屋顶护套(如果你明白为什么我陈述这个明显的东西)。I will put foil faced 1″ EPS R-Tech foam paneling to ride the 1″ spacing I created, creating an air baffle for the roof to breathe while also creating a thermal break (EPS because it doesn’t change its R-value over time or from temps like Polyiso or XPS and can breathe better). Foil facing out towards roof creating a radiant barrier as well in the air baffle channel, cause it gets ridiculously hot upstairs in summer, and the foil needs an air gap to work anyways. Unsure if I’m supposed to remove the clear plastic on the other side of foam panels, since I can’t find anything very specific about it, other then I’m thinking it’s used during the process in making them. Below this, I will put Rockwool mineral wool to fill the cavity, as much as I can against the foam board, without packing tight. Then after this, I will simply put traditional poly sheeting, 8 mils thick. I’ll only be able to collectively get about roughly R24, but with the added foil, it could potentially be a lot higher at certain times of the year when its reflecting radiant heat and this is mainly being treated as a wall, not attic, until it gets to the actual ceiling as well. Seems quite low, but originally… it was completely uninsulated on both knee walls, and floors beyond the knee walls which is also my ceiling of the first floor bedroom (mine). No soffets. No baffles. There was roughly 2 layers of faced insulation stapled directly to the roof boards and rafters, wet and disintegrated. Wet under both window sills, leaks when rains super heavy. So anything, I mean ANYTHING I do will be better. Just an empty, framed room stripped and gutted is already warmer in my house believe it or not and I live in New England. Eventually, I will put up new knee walls and I will insulate those as well, to slow heat loss/buildup further and added sound dampening. EPS Foam blocking will be installed around the rim joist, and floor will be laid with mineral wool. The knee wall space will also have OSB installed all around and be wrapped in a radiant barrier on all sides, minus the floor, to make up some difference in the insulation not being as thick later. This all might be overkill, but it’s cheap insurance to me. Under each new baffle I create, I will either drill a “2 hole for vent inserts (I know, it’s a lot), or just remove the existing board outside, and just install a continuous soffet vent providing there is room. The baffle package will lead up to the gable vent area (later to be removed and just replaced with a ridgevent), which will have it’s own insulation package in the ceiling. This complete package will end to roughly the level of the bottom of the gable end vents or level with the top of the ceiling insulation package.
天花板:
我将通过在每一个顶部添加2×4的顶部提高当前的套环连接,其中额外的2×6的顶部,而是通过撕开的块作为垫片,并且在我去的情况下,拆下当前的2x4。这将有效地提高天花板4“(当前高度对于最后所有者安装的天花板风扇肯定需要的天花板风扇的TAD是一个,由于2层分层的沉降和极端斜坡,地板大约下降约1/2”and valleys which I’m currently fixing to be in plane with better levelness). The 2X6’s atop enable them to act as floor joists for a crawl space as well. The ceiling cavities from the inside out, will be filled with mineral wool insulation, then 1/4″ fanfold foam sheets laid across the tops of the then now ceiling joists as a thermal break, and capped with OSB board creating a small crawl space in case of needed use of storage, emergencies such as a possible leaks, chimney inspection, electrical, etc… This space will also get wrapped, on all sides with radiant barrier as well later. Should be able to achieve about an R46 in the ceiling/attic crawl space. Again, 8 mil poly will be installed before sheetrock.
我已经研究和检查过的东西,我相信有缺陷我只是没有想到,错过或完全被忽视。我想我在攻击之前看出了更多的接受和经验丰富的洞察力。
GBA详细资料库
由气候和房屋部件组织的一千个建筑细节的集合
答复
我觉得你已经过分思考了其中一些。您提出的是所有细节的劳动力。你能提供一些你计划的东西,也许是你从中开始的东西吗?这将帮助每个人都更好地了解您需要做的事情。
我的第一次思考是你也不应该陷入一层多。除非您的本地代码需要它,除非将多个蒸汽屏障更多的问题而不是解决方案。
账单