Fastening House Wrap to Insulated Concrete Form Assembly
建造一个ICF房子。与我的窗户的其余部分一样,我的窗户至少为12周。无论如何,我必须用家庭包装包裹(CDX覆盖),我认为让房子开始干涸,我只会把整个东西包裹在泡沫和雨中保持uv。只是试图弄清楚附加它的最佳方式。只有我可以提出的东西正在将塑料盖上的塑料盖钉在钉子上拿出并放一些外部螺钉。听起来不太有趣。
Another thought would be to somehow tape it in place temporarily while I put some sort of furring strip for a rainscreen which could hold it against the foam.
Any suggestions that sound easier?
GBA Detail Library
A collection of one thousand construction details organized by climate and house part
Replies
What is your final wall assembly going to look like? Is the housewrap temporary or will it be part of the final assembly?
Well it was going to be temp since local inspector doesn’t require it but if I’m going through the effort I might as well leave it on and flash the window openings when I’m ready. Henry makes a 6month uv wrap so that should buy me enough time given it’s heavily shaded and wintertime here.
What kind of siding were you planning over the foam, and how were you planning on attaching it?
Hardie lap&panel over rainscreen. Might incorporate a little bit of metal
I would use the rainscreen to hold the housewrap then.
Yeah, I was hoping for a quicker install to be able to do rainscreen later but it looks like that's going to be the ticket. Thanks!!
According to Mike Guertin, the answer here is to follow the IRC:房子的建筑规范是什么wrap Installation?.
Does the IRC have a prescriptive requirement for cladding installation on above grade ICF walls? If so, does it include a second plane of protection (house wrap?)
I recently contacted an ICF manufacturer regarding the above question, and for hardie type siding on low rise residential construction they say the building needs a rain screen but the house wrap is not necessary. And the battens need to be screwed, not nailed, as the plastic inserts may shatter if nailed.
Thoughts?